Water Infrastructure•2013
Drilling & Construction of Two Water Yards in West Darfur
West Darfur State (Sirba Locality: Manzola Site & Sawani Site)
AECOM International

Verified Project Photography • Al Mofon Profile
Project Overview
Contracted by AECOM International in 2013 to execute complete drilling and civil construction of two comprehensive rural water yards in West Darfur State across Manzola and Sawani sites.
The project delivered vital drinking water resources to local communities in West Darfur under stringent international engineering and humanitarian development standards.
Scope of Work
Drilling of deep boreholes in Sirba locality
Construction of integrated water yard facilities at Manzola site
Construction of integrated water yard facilities at Sawani site
Installation of water pumping and transmission systems
VERIFIED RECORD
This project was executed by Al Mofon Foundation in compliance with contract specifications.
Project Details
Sector Category:Water Infrastructure
Location:West Darfur State (Sirba Locality: Manzola Site & Sawani Site)
Client / Partner:AECOM International
Execution Period:2013
Other Documented Projects
Water InfrastructureDrilling of 3 Deep Boreholes in Central & West DarfurCentral Darfur and West Darfur StatesWater InfrastructureAl-Thawra Water Network Replacement (30+ Km HDPE)Al-Thawra, Omdurman, Khartoum StateWater InfrastructureAl-Azhari Water Network Works (3 Km, 12-inch)Al-Azhari, Khartoum State
INSTITUTIONAL PARTNERSHIPS
LET'S BUILD THE FUTURE TOGETHER
Discuss your next engineering, construction, or water infrastructure project with our experienced multi-disciplinary team.
AL MOFON FOUNDATION FOR MULTI ACTIVITIES CO. LTD. • EST. 2010
