Water Infrastructure
Al-Azhari Water Network Works (3 Km, 12-inch)
Al-Azhari, Khartoum State

Verified Project Photography • Al Mofon Profile
Project Overview
Engineering execution of a 3 km long, 12-inch main water transmission line delivering bulk water supply across the Al-Azhari residential and commercial zone.
High-capacity water conduit vital for stabilizing hydraulic pressures across the southern Khartoum municipal grid.
Scope of Work
Trench excavation and trench-bed preparation
Laying and jointing of heavy 12-inch transmission pipeline over 3 km
Installation of isolation valves, air release assemblies, and washouts
Pressure testing and municipal grid tie-in
Technical Specifications
Line Length3 Kilometers
Diameter12 inch
VERIFIED RECORD
This project was executed by Al Mofon Foundation in compliance with contract specifications.
Project Details
Sector Category:Water Infrastructure
Location:Al-Azhari, Khartoum State
Client / Partner:[Client details retained in project dossier]
Other Documented Projects
Water InfrastructureDrilling & Construction of Two Water Yards in West DarfurWest Darfur State (Sirba Locality: Manzola Site & Sawani Site)Water InfrastructureDrilling of 3 Deep Boreholes in Central & West DarfurCentral Darfur and West Darfur StatesWater InfrastructureAl-Thawra Water Network Replacement (30+ Km HDPE)Al-Thawra, Omdurman, Khartoum State
INSTITUTIONAL PARTNERSHIPS
LET'S BUILD THE FUTURE TOGETHER
Discuss your next engineering, construction, or water infrastructure project with our experienced multi-disciplinary team.
AL MOFON FOUNDATION FOR MULTI ACTIVITIES CO. LTD. • EST. 2010